Abu Dhabi, UAE. Available worldwide, on site or remote. abdelrahmaneissawy@outlook.com

Project 01. Leisure. Abu Dhabi, UAE.

Ferrari World, Yas Island

All discipline Scan-to-BIM delivery at LOD 400, from scan strategy and registration QA through deviation sign off to federated clash resolution.

Role
BIM and Digital Transformation Manager
Scope
Scan-to-BIM, all disciplines
Level of detail
LOD 400
Standards
ISO 19650

01

Project intro

Site photography

Directed all discipline Scan-to-BIM delivery at LOD 400 across the site, setting the scope and delivery approach from scan strategy through to model handover.

Aerial view of Ferrari World, Yas Island

02

Task Information Delivery Plan

Excel. ISO 19650.

Authored the TIDP covering the full survey and as built scope. Every model deliverable coded by discipline, level, document type and sequence, each with an owner and a delivery milestone.

TIDP spreadsheet listing coded model deliverables

03

LOIN register

Autodesk Construction Cloud

Defined Level of Information Need per discipline, aligning client requirements with what modelling teams were actually asked to produce.

Level of Information Need register

04

Point cloud registration

Trimble. Autodesk Recap.

Oversaw scan strategy and QA of registration accuracy before any data was handed to the modelling teams.

Registered point cloud of the park with the scan list open

05

Cloud versus model overlay

Trimble. Navisworks.

Validated model accuracy directly against as built scan data as a standing part of the QA process.

Point cloud overlaid on the model, coloured by deviation

06

Deviation heat maps

Trimble. CloudCompare.

Set the deviation tolerance thresholds and reviewed heat map outputs as the basis for sign off.

Deviation results report with heat map and measured points

07

Deviation reporting

Excel

Reviewed and approved the deviation reporting standard adopted across the project.

Deviation point table with per point magnitudes

08

LOD 400 by discipline

Autodesk Construction Cloud. Revit.

Coordinated discipline leads to reach a consistent LOD 400 across architecture, structure and MEP.

Discipline model deliverables in the common data environment

09

Issue resolution

Autodesk Construction Cloud

Managed the issue resolution workflow and ran coordination meetings across disciplines through to close out.

Coordination issues raised against the federated model

10

Federated model and clash

Navisworks

Led federated model review and set the clash resolution strategy for the full design team.

Federated model review with sectioning tools and issue pins

Contact

Want the detail behind any of this?

Happy to walk through the delivery approach, the standards applied, or the coordination workflow.

Email me LinkedIn All projects